February 25, 2022 (v1)
Publication
The feasibility studies of the slowed down beam setup involving deceleration of a 64Ni beam at 250 MeV/u to 13 MeV/u in a thick Al degrader was performed at the FRagment Separator (FRS) at GSI. The experimentally measured energy spread and the nuclear reaction yields in the degrader are in good agreement with simulations.
Uploaded on: March 27, 2023