The former underground lauching control room 1 of the ground based component of the french nuclear missile system has been decommissioned. This installation has been designed and built to remain operational even in case of a near-by nuclear blast. As a result it is robust to radioactive clouds, thermal and mechanical waves as well as...
-
2002 (v1)Conference paperUploaded on: October 25, 2024
-
2003 (v1)Journal article
Since the decommission of the underground launching control room of the ground-based component of the French nuclear missile system, the whole installation has been turned into a cross-disciplinary underground laboratory. The LSBB is a unique low-noise underground laboratory because of its initial military conception and its location in the...
Uploaded on: December 4, 2022