In this paper, the capacitated dynamic lot sizing problem in integrated manufac-turing/remanufacturing systems is addressed. These kinds of production systems are designed to satisfy the demands of different classes of single-level products not only by manufacturing raw materials, but also by remanufacturing returned products. A single machine...
-
2017 (v1)PublicationUploaded on: April 14, 2023
-
2020 (v1)Publication
Multi-sided assembly line balancing problems usually occur in plants producing big-sized products such as buses, trucks, and helicopters. In this type of assembly line, in each workstation, it is possible to install several workplaces, in which a single operator performs his/her own set of tasks at an individual mounting position. In this way,...
Uploaded on: April 14, 2023 -
2017 (v1)Publication
Multi-manned assembly lines are usually found in plants producing large-sized high-volume products such as automotive sector. In this paper, the balancing problem of this kind of assembly lines with skilled workers is addressed. A new mixed integer programming formulation is presented to solve this problem optimally with the objective of...
Uploaded on: April 14, 2023 -
2022 (v1)Publication
In this paper, the capacitated lot-sizing and scheduling problem with sequence dependent setup times and costs in a closed loop supply chain is addressed. The system utilizes the closed-loop supply chain strategy so that the multi-class single-level products are produced through both manufacturing of raw materials and remanufacturing of...
Uploaded on: April 14, 2023