Published May 28, 2024
| Version v1
Publication
Urbanización de viviendas y gestión ecoeficiente de residuos de construcción en Chile: aplicación del modelo español
Description
This paper summarises a pioneering experience in construction and
demolition waste management (C&DW) in Chile. The case study consists of
the construction of 17 detached dwellings that are part of an urbanisation
project in the city of Temuco, in the Araucana region. The methodology
developed in Spain for the C&DW quantification is employed for the
calculation of expected waste in construction projects. The implementation of
the proposed methodology, which includes waste separation activities on the
construction site, can halve management costs, as well as the environmental
cost of construction works. The case study shows the feasibility and
adaptation of the Spanish methodology to an urbanisation project in Chile.
Furthermore, its application generates triple benefits: environmental, social
and economic. At the same time, the new proposal to reuse, recycle, treat or
eliminate the waste produced sets new challenges in the areas of legislation
and government management, which are elements to be considered if Chile is
to achieve C&DW managemant standards similar to those in place in Brazil
and the European Union
Additional details
Identifiers
- URL
- https://idus.us.es/handle//11441/159247
- URN
- urn:oai:idus.us.es:11441/159247
Origin repository
- Origin repository
- USE